Two-person PCMS setup has been standard practice long enough that most...
Deployment Field Operations
Articles
read more
Why Setup Time Matters More Than You Think on Active Roadways
Setup time is how long a deployment takes. Most operations track it loosely —...
Single-Operator PCMS Deployment Cuts Roadside Risk
Every minute a worker spends on a live shoulder is a minute of documented...
What Cleated Footplates Do That Ballast Weight Alone Cannot
Ballast weight is how the industry has historically answered the PCMS...
How Slope Capability Determines Where a Message Board Can Legally and Safely Sit
Slope is rarely the first thing an operator thinks about when selecting a PCMS...
What the AASHTO 18-Foot Guideline Actually Means for Your Operation
There is a number that shows up in roadside safety guidance that most traffic...
Why PCMS Tip-Overs Are Not Weather Events — They’re Engineering Failures
When a portable changeable message sign goes over in a windstorm, the incident...
How to Read Controller Data to Predict Lockouts
Most lockouts don’t “just happen.” The controller almost always warns you...
Full-Size PCMS Comparison: Spyder Platform vs Traditional Message Boards
Comparison of Full-Sized, Full-Matrix Portable Message Boards This document...
Questions? Give us a call.









